Waste Water Documents and Links 
- Sewer System Management Plan - Revision #3 (2022)
- Sewer System Management Plan - Revision #2 (2018) - Part 1, Part 2, Part 3
- Sewer System Management Plan - Revision #1 (2013)
- 2014 PG Sewer Collection System Master Plan
- Wastewater Collection System Main Sewer Line Repair and Replacement Project - Phase #7
- Links
2013 System Management Plan (Revision #1)The Sewer System Management Plan (SSMP) that describes the collection system facilities, operations and maintenance, and capital improvement projects.
The State Water Resources Control Board (SWRCB) Statewide General Waste Discharge Requirements (WDR) require all public wastewater collection system agencies in California that own and operate sanitary sewer systems greater than one mile in length, which collect or convey untreated or partially treated wastewater to a publicly owned treatment facility, to develop, implement, and maintain a SSMP and report sanitary sewer overflows (SSOs) using the State’s electronic reporting system, California Integrated Water Quality System (CIWQS).
Table of Contents/Executive Summary
Introduction
The SSMP includes the following eleven (11) Elements:
- Goal
- Organization
- Legal Authority 3.1 3.2 3.3
- Operation and Maintenance Program 4.1 4.2 4.3 4.4
- Design and Performance Provisions
- Overflow Emergency Response Plan
- FOG Control Program
- System Evaluation and Capacity Assurance Plan
- Monitoring, Measurement, and Program Modifications
- Sewer System Management Plan Program Audits
- Communication Program
2014 PG Sewer Collection System Master PlanThe Sewer Master Plan provides a summary of the existing facilities, wastewater flows, identified system capacity deficiencies for existing and future conditions, recommended capital improvement projects (CIP), recommended operation and maintenance practices, and recommended inspection programs.
- 2014 PG Sewer Collection System Master Plan
- 10-Year Sewer Collection System Financial Plan and Rate Study
Wastewater Collection System Main Sewer Line Repair and Replacement Project - Phase #7This capital project continues scheduled upgrades to existing City sewer main line infrastructure under Phase #7 in accord with the 2004 Sewer System Asset Management Plan (SSMP). This phase will replace approximately 6,000 linear feet of existing clay sewer lines with new PVC sewer lines, make 6 spot repairs to existing sewer lines, and reconstruct and/or install 11 new sewer manhole access portals throughout the City.
CEQA Notice of Exemption - Phase 7 Waste Water
Links
- Municipal Code 9.20 Sewage Disposal
- Monterey One Water (Formerly Monterey Regional Water Pollution Control Agency)
- Southern Monterey Bay Dischargers Group - Clog Busters is a consortium of wastewater collection system owners and wastewater treatment jurisdictions located in northern Monterey County, also known as the Southern Monterey Bay Dischargers Group
- Central Coast Regional Water Quality Control Board
- California Association of Sanitation Agencies