Active Construction butterfly

FY21/22 Street Rehabilitation on funston Ave & Lower lighthouse Ave
Scope of Work: This project will rehabilitate two heavily trafficked road segments. The full scope of work is noted below. 

Lower Lighthouse Ave (Eardley Ave to 13th St):
  • 70,500 SF of pavement reconstruction
  • 2,000 SF of 2” AC overlay
  • Reconstruction of 14 curb ramps
  • Storm drain improvements including installation of 4 catch basins, 1,410 LF of subdrain, and reconstruction of 85 LF of curb and gutter
  • Reconstruction 3 manholes
  • 4 sewer spot repairs, and
  • Replacement of 310 LF of sewer line
Funston Ave (Presidio Blvd to Montecito Ave):
  • 41,000 SF of 2.5” AC Overlay
  • 4,600 SF of pavement reconstruction
  • Construction of 2 catch basins, and
  • 6 sewer spot repairs 

TIMING: Construction will begin in May 2021. For more information on the construction, timeline visit cityofpg.org/publicworks

PARKING & TRAFFIC: Construction notices and "No Parking" signs will be posted in advance of construction. Please expect temporary closures and/or detours during construction.


Wet Dry-Weather Capture and Diversion Project


  • Scope of Work: This project will reduce bacteria and other potential pollutants from entering the Monterey Bay Sanctuary by capturing and diverting stormwater flows west of Lovers Point Park. The captured rainwater will be directed into the sanitary sewer system and directed to Monterey One Water for treatment and reuse. To accomplish this goal the project entails:
    • Installation of 2,858 SF of waste water pipes, and
    • Installation of an underground stormwater capture and diversion tank
  • Project Locations Locations: 
    • Ocean View Blvd from 15th St to 19th St
    • Ocean View Blvd from Sea Palm Ave to Coral Ave
    • Sea Palm Ave from Del Monte Blvd to Ocean View Blvd
    • Del Monte Blvd from Sea Palm Ave to Egan Ave
  • Construction Timeline:  June 2020 - February 2021

Sewer Collection System Master Plan Projects 3, 4, 5 & 8
  • Scope of Work: This project will allow for vital sewer infrastructure improvements identified in the City's Sewer Collection System Master Plan (CIP projects 3, 4, 5, & 8). Together, the scope of work for these projects include:
    • Replacement/installation of 4,735 ft of waste water pipe
    • Rehabilitation/replacement of 18 manholes
  • Locations: 
    • Carmel Ave from Ocean View Blvd. to Central Ave
    • Carmel Ave from Pine Ave to Junipero Ave
    • 15th St from Pine Ave to Junipero Ave
    • Asilomar Ave from Ocean View Blvd to Arena Ave
    • Easement from Crocker Ave to Grove Acre
    • Crocker Ave from Arena Ave to Sunset Drive
  • Construction Timeline: June 2020 - December 2020