2013  System Management Plan (Revision #1)The Sewer System Management Plan (SSMP) that describes the collection system facilities, operations and maintenance, and capital improvement projects.
The State Water Resources Control Board (SWRCB) Statewide General Waste Discharge Requirements (WDR) require all public wastewater collection system agencies in California that own and operate sanitary sewer systems greater than one mile in length, which collect or convey untreated or partially treated wastewater to a publicly owned treatment facility, to develop, implement, and maintain a SSMP and report sanitary sewer overflows (SSOs) using the State’s electronic reporting system, California Integrated Water Quality System (CIWQS).

Table of Contents/Executive Summary

Introduction

The SSMP includes the following eleven (11) Elements:


2014 PG Sewer Collection System Master PlanThe Sewer Master Plan provides a summary of the existing facilities, wastewater flows, identified system capacity deficiencies for existing and future conditions, recommended capital improvement projects (CIP), recommended operation and maintenance practices, and recommended inspection programs.


Wastewater Collection System Main Sewer Line Repair and Replacement Project - Phase #7This capital project continues scheduled upgrades to existing City sewer main line infrastructure under Phase #7 in accord with the 2004 Sewer System Asset Management Plan (SSMP). This phase will replace approximately 6,000 linear feet of existing clay sewer lines with new PVC sewer lines, make 6 spot repairs to existing sewer lines, and reconstruct and/or install 11 new sewer manhole access portals throughout the City. 

CEQA Notice of Exemption - Phase 7 Waste Water 